subject
Physics, 19.08.2019 07:30 brittanyfox411

What is the value of work done on an object when a 70 newton force moves it 9.0 meters in the same direction as the force

ansver
Answers: 2

Other questions on the subject: Physics

image
Physics, 21.06.2019 21:00, aruhter9485
Apulley with a mechanical advantage of 5 will require you to pull times the amount of rope. a. 1/5 b. 5 c. 10 d. 15
Answers: 2
image
Physics, 22.06.2019 00:50, gungamer720
Acave rescue team lifts an injured spelunker directly upward and out of a sinkhole by means of a motor-driven cable. the lift is performed in three stages, each requiring a vertical distance of 10.0 m: (a) the initially stationary spelunker is accelerated to a speed of 4.90 m/s; (b) he is then lifted at the constant speed of 4.90 m/s; (c) finally he is decelerated to zero speed. how much work is done on the 68.0 kg rescue by the force lifting him during each stage?
Answers: 1
image
Physics, 22.06.2019 02:30, chelsea73
You are about to open a container of soy milk but notice that there are instructions to “shake well before serving.” the soy milk is most likely a
Answers: 1
image
Physics, 22.06.2019 15:00, sloane50
What happens to an isotope during radioactive decay?
Answers: 2
You know the right answer?
What is the value of work done on an object when a 70 newton force moves it 9.0 meters in the same d...

Questions in other subjects:

Konu
History, 23.11.2020 21:40