subject
Mathematics, 03.08.2019 21:30 ericamiller165p58e0p

Ttakes about 14 person-hours of labor to break up a driveway and clear away the rubble. it takes about 8 person-hours of labor to pour and smooth concrete for the new driveway. about how many person-hours of labor does it take to break up a driveway, clear away the rubble, pour the concrete, and smooth the concrete?  6

ansver
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 19:00, rodriguezzamyy
There is an entrance to the computer room at point e which lies on ab and is 5 feet from point a. plot point e on the coordinate plane. find the distance from the entrance at point e to the printer at point e
Answers: 1
image
Mathematics, 21.06.2019 19:30, bakaoffire
Mr. brettler is hanging up a 5-foot tall rectangular welcome sign in the gym. he has drawn a sketch on a coordinate grid. he has the lower vertices of the sign at (9, –3) and (–6, –3). where would the upper vertices be on the grid?
Answers: 1
image
Mathematics, 21.06.2019 19:40, nsg0686
What is the slope of the line that contains the points (-2,1) and (0,-3)
Answers: 2
image
Mathematics, 21.06.2019 20:30, 2022maldonadoleonel
Your friend uses c=50p to find the total cost, c, for the people, p, entering a local amusement park what is the unit rate and what does it represent in the context of the situation?
Answers: 2
You know the right answer?
Ttakes about 14 person-hours of labor to break up a driveway and clear away the rubble. it takes abo...

Questions in other subjects:

Konu
Mathematics, 18.07.2019 01:30