subject
Mathematics, 30.12.2021 15:20 genyjoannerubiera

Using skilled workers and unskilled workers, a manufacturer can produce (, ) = 10 1 2 units. Currently, the manufacturer uses 30 hours of skilled labor and 36 hours of unskilled labor and is planning to use 1 additional hour of skilled labor. Estimate the corresponding change that the manufacturer should make in the level of unskilled labor so that the total output will remain the same.

ansver
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 18:30, angelapegues20097
Tyler enjoys the fish so much that after his birthday his family decides to take him to a famous aquarium a tank at the aquarium is similar to his tank with the scale factor of 8 how many times greater is the volume of the tank at the aquarium than the volume of tyler tank
Answers: 2
image
Mathematics, 21.06.2019 20:10, jesus319
Read the excerpt from the strange case of dr jekyll and mr. hyde what do dr. jekyll's thoughts reveal about him in this excerpt? [t]he inmates of my house were locked in the most rigorous hours of slumber, and i determined, flushed as i was with hope and triumph, to venture in my new shape as far as to my bedroom. i crossed the yard, wherein the constellations looked down upon me, i could have thought, with wonder, the first creature of that sort that their unsleeping vigilance had yet disclosed to he is jealous of those who can sleep through the night. he is revered for his scientific advances. he is interested in studying the movements of the stars he is proud and enthusiastic about his initial results.
Answers: 3
image
Mathematics, 21.06.2019 21:10, cheyennemitchel238
What is the equation of a line passing through (-6,5) and having a slope of 1/3
Answers: 3
image
Mathematics, 22.06.2019 02:30, katlynsellars7750
Amotorboat maintained a constant speed of 12 miles per hour relative to the water in going 45 miles upstream and then returning. the total time for the trip was 8.0 hours. use this information to find the speed of the current.
Answers: 1
You know the right answer?
Using skilled workers and unskilled workers, a manufacturer can produce (, ) = 10 1 2 units. Current...

Questions in other subjects: