subject
Mathematics, 16.03.2020 23:27 s11074739

Two computer specialists are completing work orders. The first specialist receives 60% of all orders. Each order takes her Exponential amount of time with parameter λ1 = 3 hrs−1. The second specialist receives the remaining 40% of orders. Each order takes him Exponential amount of time with parameter λ2 = 2 hrs−1. A certain order was submitted 30 minutes ago, and it is still not ready. What is the probability that the first specialist is working on it?

ansver
Answers: 3

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 22:30, lauren21bunch
Gabrielle's age is two times mikhail's age. the sum of their ages is 84. what is mikhail's age?
Answers: 2
image
Mathematics, 21.06.2019 23:30, natishtaylor1p8dirz
What is the gcf of 20c^3-5c^4+30c^6
Answers: 2
image
Mathematics, 22.06.2019 00:20, destinyd10189
Ze trinomial x2 + bx – c has factors of (x + m)(x – n), where m, n, and b are positive. what is ze relationship between the values of m and n? explain how you got ze answer
Answers: 2
image
Mathematics, 22.06.2019 01:40, Anshuman2002
(co 3) the soup produced by a company has a salt level that is normally distributed with a mean of 5.4 grams and a standard deviation of 0.3 grams. the company takes readings of every 10th bar off the production line. the reading points are 5.8, 5.9, 4.9, 6.5, 5.0, 4.9, 6.2, 5.1, 5.7, 6.1. is the process in control or out of control and why? it is out of control as two of these data points are more than 2 standard deviations from the mean it is in control as the data points more than 2 standard deviations from the mean are far apart it is out of control as one of these data points is more than 3 standard deviations from the mean it is in control as the values jump above and below the mean
Answers: 2
You know the right answer?
Two computer specialists are completing work orders. The first specialist receives 60% of all orders...

Questions in other subjects:

Konu
Mathematics, 09.06.2020 11:57