subject
Mathematics, 24.10.2019 02:20 mylittleponeyfbrarit

The ratio of number of days it takes the first team to complete a project to the number of days it takes the second team to complete a project is 2: 3. if both the teams together can do it in 6 days how long would it take each team to do it alone

ansver
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 15:40, jaylene125
Need ! discuss how to convert the standard form of the equation of a circle to the general form. 50 points
Answers: 1
image
Mathematics, 22.06.2019 00:30, zapata12
Parallelogram rstu is a rhombus. m∠r = 120° what is m∠t = 120 (what is m∠rsu? )
Answers: 2
image
Mathematics, 22.06.2019 01:10, andrejr0330jr
Farmers know that driving heavy equipment on wet soil compresses the soil and injures future crops. here are data on the "penetrability" of the same type of soil at two levels of compression. penetrability is a measure of how much resistance plant roots will meet when they try to grow through the soil. compressed soil 2.85 2.66 3 2.82 2.76 2.81 2.78 3.08 2.94 2.86 3.08 2.82 2.78 2.98 3.00 2.78 2.96 2.90 3.18 3.16 intermediate soil 3.17 3.37 3.1 3.40 3.38 3.14 3.18 3.26 2.96 3.02 3.54 3.36 3.18 3.12 3.86 2.92 3.46 3.44 3.62 4.26 use the data, omitting the high outlier, to give a 95% confidence interval for the decrease in penetrability of compressed soil relative to intermediate soil. compute degrees of freedom using the conservative method. interval: to
Answers: 1
image
Mathematics, 22.06.2019 02:40, jujulakaeuaws
Perform the indicated operation and write the answer in the form a + bi. (-5 + 2) + (3 - 6i)
Answers: 3
You know the right answer?
The ratio of number of days it takes the first team to complete a project to the number of days it t...

Questions in other subjects: