subject
Engineering, 19.10.2021 18:30 imanim3851

scrapers are used to haul dirt from a borrow pit to the cap of a landfill. the estimated cycle time for the scrapers is 9.5 minutes. The scrapers carry 10 cubic yards of soil per trip . using a system efficiency of 45 minutes per hour and producitivity factor of determine the number of labor hours to haul 1 cubic yard of dirt. each scraper require one operator

ansver
Answers: 1

Other questions on the subject: Engineering

image
Engineering, 03.07.2019 14:10, cowgyrlup124
Explain the difference laminar and turbulent flow. explain it with the shear stress and the velocity profiles.
Answers: 1
image
Engineering, 04.07.2019 18:10, xboxdude06
Slip occurs via two partial dislocations because of (a) the shorter path of the partial dislocation lines; (b) the lower energy state through partial dislocations; (c) the charge balance.
Answers: 1
image
Engineering, 04.07.2019 18:20, samueltaye
Modern high speed trains do not have perpendicular expansion gaps where rails are joined end-to-end any more they are mostly welded together but what might happen if there was a spell of particularly hot weather that causes inspection of the tracks?
Answers: 1
image
Engineering, 04.07.2019 19:10, phantomlizz3233
In general, how do thermosetting plastics compare to thermoplastics in mechanical and physical properties?
Answers: 3
You know the right answer?
scrapers are used to haul dirt from a borrow pit to the cap of a landfill. the estimated cycle time...

Questions in other subjects: