subject
Engineering, 27.09.2021 16:30 heartprague

If there are power lines near a work site, it must be determined how close they are to any crane activities. Which of the following are options for keeping workers safe if the power lines will be closer than 20 feet to crane activities?

ansver
Answers: 3

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 16:10, TheOriginalMeyah
An electrical motor raises a 50kg load at a construct velencity .calculate the power of the motor, if it takes 40sec to raise the load through a height of 24m(take g =9.8n/g)
Answers: 2
image
Engineering, 04.07.2019 18:10, siri5645
At 12 noon, the count in a bacteria culture was 400; at 4: 00 pm the count was 1200 let p(t) denote the bacteria cou population growth law. find: (a) an expression for the bacteria count at any time t (b) the bacteria count at 10 am. (c) the time required for the bacteria count to reach 1800.
Answers: 1
image
Engineering, 04.07.2019 18:10, colin774
The higher the astm grain size number, the finer the gran is. a)-true b)-false
Answers: 2
image
Engineering, 04.07.2019 18:20, sarah7984
Vibration monitoring this technique uses the noise or vibration created by mechanical equipment and in seme cases by plant systems to detemine their actual condtion. a)- true b)- false
Answers: 2
You know the right answer?
If there are power lines near a work site, it must be determined how close they are to any crane act...

Questions in other subjects:

Konu
Biology, 18.01.2020 14:31