The results of cost estimating can be used to serve all of the following objectives, except a)- benchmarking of a firm's productivity improvements b)- evaluating the optimal capital required to make improvements to products (product design) c)- cost estimating doesn't really make sense to engineers. it is the responsibility of accountants. d)- setting selling prices in evaluating engineering contract projects e. none of the above

ansver
Answers: 3

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:10, agpraga23ovv65c
Carbon dioxide gas expands isotherm a turbine from 1 mpa, 500 k at 200 kpa. assuming the ideal gas model and neglecting the kinetic and potential energies, determine the change in entropy, heat transfer and work for each kilogram of co2.
Answers: 2
image
Engineering, 04.07.2019 18:10, colin774
The higher the astm grain size number, the finer the gran is. a)-true b)-false
Answers: 2
image
Engineering, 04.07.2019 18:10, mamasbug4285
An air compression refrigeration system is to have an air pressure of 100 psia in the brine tank and an allowable air temperature increase of 60°f for standard vapor compression cycle temperatures of 77 f entering the expansion cylinder and 14 f entering the compression cylinder, calculate the coefficient of performance a. 2.5 b 3.3 c. 4.0 d. 5.0
Answers: 3
image
Engineering, 04.07.2019 18:20, kodyclancy
Aquick transition of the operating speed of a shaft from its critical speed will whirl amplitude. (a) increase (b) limit (c) not affect (d) zero
Answers: 2
You know the right answer?
The results of cost estimating can be used to serve all of the following objectives, except a)- benc...

Questions in other subjects:

Konu
History, 23.01.2020 19:31
Konu
Mathematics, 23.01.2020 19:31
Konu
Mathematics, 23.01.2020 19:31