subject
Business, 11.02.2021 22:40 zulfiquer5541

You and your friends hike a total of 8 miles to the nearest campsite (Activity A). Upon arriving you break off into teams. One team will set up tents and hammocks for everyone to sleep in (Activity B). At the same time, another team will get wood for a fire (Activity C). Once they have the wood, that same team then proceeds to start the fire (Activity D). The third team will walk to find water (Activity E) and once they find it they will to collect water and bring it back to camp (Activity F). Once the fire is ready and the water is brought back to camp the two groups- the one collecting firewood and the one collecting water- will then purify the water (Activity G). Once the camp is set up and the water is purified everyone will come together and cook dinner around the campfire (Activity H). Once dinner is prepared and eaten half of the group stays behind to put out the fire (Activity I) and half of the group walks away from the campsite to dispose of the food waste (Activity J). After disposing of the food waste the second half of the group returns to the camp (Activity K). Once everyone is at the campsite the day of camping ends Activity Optimistic time Most Likely Time Pessimistic Time
to complete to Complete to Complete
A Hike to the campsite 3 5 8
B Set up campsite 2 4 5
C Collect wood for fire 1 3 5
D Start a fire 1 2 3
E Find water 0.5 1 3
F Collect water and bring it 1 2 4
back to canm
G Purify the water 1 2 4
H Cook and eat dinner 1 3 4
I Put out fire 1 2 4
J Dispose of food waste 0.5 2 3
K Return from food waste disposal 0.25 1 2
a. Determine the critical path of the PERT chart in a.
b. Assuming a deterministic system how long will it take to complete the entire process.

ansver
Answers: 2

Other questions on the subject: Business

image
Business, 22.06.2019 07:40, sistersquad
Myflvs -question 3 multiple choice worth 2 points)(10.04 hc)in panama city in january, high tide was at midnight. the water level at high tide was 9 feet and1 foot at low tide. assuming the next high tide is exactly 12 hours later and that the height of thewater can be modeled by a cosine curve, find an equation for water level in january for panamacity as a function of time (t).of(t) = 4 + 5of(t) = 5 cost + 4o 460) = 5 cos 1+ 4of(0) = 4 cos + 5
Answers: 1
image
Business, 22.06.2019 17:30, neriah30
Fabian got into an accident on his way to work. he had multiple fractures in his leg. his doctor advised strict bed rest for at least three months. fabian is a freelance wildlife photographer who usually works on a contract basis, and this is his primary source of income. before the accident, fabian was planning his finances. which goal of his financial plan would fabian in getting through without pay for the next three months? the goal that requires the creation of a/an would fabian get through the next three months without pay.
Answers: 1
image
Business, 22.06.2019 19:00, FoxGirl1971
1. regarding general guidelines for the preparation of successful soups, which of the following statements is true? a. thick soups made with starchy vegetables may thin during storage. b. soups should be seasoned throughout the cooking process. c. finish a cream soup well before serving it to moderate the flavor. d. consommés take quite a long time to cool.
Answers: 2
image
Business, 22.06.2019 21:00, legazzz
Ryan terlecki organized a new internet company, capuniverse, inc. the company specializes in baseball-type caps with logos printed on them. ryan, who is never without a cap, believes that his target market is college and high school students. you have been hired to record the transactions occurring in the first two weeks of operations.
Answers: 1
You know the right answer?
You and your friends hike a total of 8 miles to the nearest campsite (Activity A). Upon arriving you...

Questions in other subjects:

Konu
Mathematics, 09.04.2021 22:20
Konu
Chemistry, 09.04.2021 22:20
Konu
Biology, 09.04.2021 22:20