subject
Business, 29.10.2020 17:50 barbiegirllover

A sheetrock hanger finds he needs 119 sheets of 112"sheetrock to complete a remodeling job.
He has 39 sheets. How many additional sheets
should he order?

ansver
Answers: 2

Other questions on the subject: Business

image
Business, 22.06.2019 08:40, Damagingawsomeness2
Gerda, a real estate agent, is selling a moderately priced house in a subdivision. she knows from her uncle that the factory being built half a mile from the subdivision will be manufacturing dog food, using a process that creates a very strong odor that permeates the surrounding neighborhood. a buyer, who is unaware of the type of factory under construction, makes an offer on one of the houses gerda is selling, and within a short time, the deal goes through. what does this scenario best illustrate?
Answers: 3
image
Business, 22.06.2019 17:00, kiahbryant12
Zeta corporation is a manufacturer of sports caps, which require soft fabric. the standards for each cap allow 2.00 yards of soft fabric, at a cost of $2.00 per yard. during the month of january, the company purchased 25,000 yards of soft fabric at $2.10 per yard, to produce 12,000 caps. what is zeta corporation's materials price variance for the month of january?
Answers: 2
image
Business, 22.06.2019 18:00, slycooper99
During the holiday season, maria's department store works with a contracted employment agency to bring extra workers on board to handle overflow business, and extra duties such as wrapping presents. maria's is using during these rush times.
Answers: 3
image
Business, 22.06.2019 19:50, ahoney2233
Statistical process control charts: a. indicate to the operator the true quality of material leaving the process. b. display upper and lower limits for process variables or attributes and signal when a process is no longer in control. c. indicate to the process operator the average outgoing quality of each lot. d. display the measurements on every item being produced. e. are a graphic way of classifying problems by their level of importance, often referred to as the 80-20 rule.
Answers: 2
You know the right answer?
A sheetrock hanger finds he needs 119 sheets of 112"sheetrock to complete a remodeling job.
H...

Questions in other subjects: