subject
Business, 25.07.2020 20:01 lanakay2006

Compute Lead Time Williams Optical Inc. is considering a new lean product cell. The present manufacturing approach produces a product in four separate steps. The production batch sizes are 45 units. The process time for each step is as follows: Process Step 1 5 minutes Process Step 2 8 minutes Process Step 3 4 minutes Process Step 4 3 minutes The time required to move each batch between steps is 5 minutes. In addition, the time to move raw materials to Process Step 1 is also 5 minutes, and the time to move completed units from Process Step 4 to finished goods inventory is 5 minutes. The new lean layout will allow the company to reduce the batch sizes from 45 units to 3 units. The time required to move each batch between steps and the inventory locations will be reduced to 2 minutes. The processing time in each step will stay the same. Determine the value-added, non-value-added, and total lead times, and the value-added ratio under the present and proposed production approaches. If required, round percentages to one decimal place. Present Approach Proposed Approach Value-added time min min Non-value-added time min min Total lead time min min Value-added ratio (as a percent) % %

ansver
Answers: 3

Other questions on the subject: Business

image
Business, 22.06.2019 04:30, csteward2917
Your take on decision making process
Answers: 1
image
Business, 22.06.2019 06:40, SkyMelvin
10. which of the following is true regarding preretirement inflation? a. defined-benefit plans provide more inflation protection than defined-contribution plans. b. because of preretirement inflation, possible investment-related growth is increased for defined-contribution plans. c. all types of benefits are designed to cope with preretirement inflation. d. preretirement inflation is generally reflected in the increase in an employee's compensation level over a working career.
Answers: 3
image
Business, 22.06.2019 12:30, sloane50
land, a building and equipment are acquired for a lump sum of $ 1,000,000. the market values of the land, building and equipment are $ 300,000, $ 800,000 and $ 300,000, respectively. what is the cost assigned to the equipment? (do not round any intermediary calculations, and round your final answer to the nearest dollar.)
Answers: 1
image
Business, 22.06.2019 18:40, bella2331
Under t, the point (0,2) gets mapped to (3,0). t-1 (x, y) →
Answers: 3
You know the right answer?
Compute Lead Time Williams Optical Inc. is considering a new lean product cell. The present manufact...

Questions in other subjects:

Konu
Mathematics, 21.09.2020 14:01
Konu
Mathematics, 21.09.2020 14:01
Konu
Mathematics, 21.09.2020 14:01