An asphalt paving crew is used to pave a road 8,000 feet long. The road is 48 feet wide and the paving machine can pave a 12-foot-wide strip of road during each pass. The machine paves 13 lineal feet of 12-foot-wide road per minute. Two lifts of asphalt are needed to pave the road. After completing a pass, it takes the crew 15 minutes to turn the paving machine around and get ready for the next pass. The crew consists of a foreperson, seven operators, and one laborer. Using the system efficiency of 45 minutes per hour, determine the number of labor hours required to place 1 lineal foot of road 12 feet wide.

ansver
Answers: 3

Other questions on the subject: Business

image
Business, 21.06.2019 20:00, homeschool0123
Your assessment tool contains rich data about child progress in language and literacy but no details to explain the differences between children. you decide to: a. replace the tool with another b. analyze the data using factors such as language, ability, and participation rates c. review your anecdotal notations regarding language and literacy development d. talk with families about what they are seeing at home
Answers: 2
image
Business, 21.06.2019 21:30, tilacohen
1. gar principles or "the principles"are intended to do what?
Answers: 2
image
Business, 22.06.2019 02:40, shadow29916
Aquatic marine stores company manufactures special metallic materials and decorative fittings for luxury yachts that require highly skilled labor. aquatic uses standard costs to prepare its flexible budget. for the first quarter of the year, direct materials and direct labor standards for one of their popular products were as follows: direct materials: 3 pounds per unit; $ 6 per pound direct labor: 4 hours per unit; $ 19 per hour during the first quarter, aquatic produced 5 comma 000 units of this product. actual direct materials and direct labor costs were $ 65 comma 000 and $ 330 comma 000, respectively. for the purpose of preparing the flexible budget, calculate the total standard direct materials cost at a production volume of 5 comma 000 units.
Answers: 2
image
Business, 22.06.2019 12:10, destinycasillas
Profits from using currency options and futures. on july 2, the two-month futures rate of the mexican peso contained a 2 percent discount (unannualized). there was a call option on pesos with an exercise price that was equal to the spot rate. there was also a put option on pesos with an exercise price equal to the spot rate. the premium on each of these options was 3 percent of the spot rate at that time. on september 2, the option expired. go to the oanda. com website (or any site that has foreign exchange rate quotations) and determine the direct quote of the mexican peso. you exercised the option on this date if it was feasible to do so. a. what was your net profit per unit if you had purchased the call option? b. what was your net profit per unit if you had purchased the put option? c. what was your net profit per unit if you had purchased a futures contract on july 2 that had a settlement date of september 2? d. what was your net profit per unit if you sold a futures contract on july 2 that had a settlement date of september 2
Answers: 1
You know the right answer?
An asphalt paving crew is used to pave a road 8,000 feet long. The road is 48 feet wide and the pavi...

Questions in other subjects:

Konu
Mathematics, 30.06.2019 22:30
Konu
Mathematics, 30.06.2019 22:30