subject
Physics, 13.07.2019 11:00 smiley0326

When work is done by a system and no heat is added, the temperature of the system?

ansver
Answers: 1

Other questions on the subject: Physics

image
Physics, 22.06.2019 05:30, kaitlynmoore42
James is trying to prove newton's 2nd law of motion. he tries to move four different objects with different masses, shapes, and sizes from point a to point b. the objects are a toy car, a car, a refrigerator, and a kitchen table. after some experimentation, he finds that force is dependent on the mass of the object, rather than it's size or shape. the object that takes the most force to move is the
Answers: 1
image
Physics, 22.06.2019 10:00, jonlandis6
Need people build a dam to create a reservoir that supplies water a nearby city needs. describe two ways this action will likely affect the water cycle in the local environment. (5 points) worth 20 points
Answers: 1
image
Physics, 22.06.2019 12:20, zenaidazurita1p6bs1d
Electric field of the earth. the earth has a net electric charge that causes a field at points near its surface equal to 150 n> c and directed in toward the center of the earth. (a) what magnitude and sign of charge would a 60-kg human have to acquire to overcome his or her weight by the force exerted by the earth’s electric field? (b) what would be the force of repulsion between two people each with the charge calculated in part (a) and separated by a distance of 100 m? is use of the earth’s electric field a feasible means of flight? why or why not?
Answers: 2
image
Physics, 22.06.2019 13:10, jaeana
1. the materials manager for a billiard ball maker must periodically place orders for resin, one of the raw materials used in producing billiard balls. she knows that manufacturing uses resin at a rate of 50 kilograms each day, and that it costs $.04 per day to carry a kilogram of resin in inventory. she also knows that the order costs for resin are $100 per order, and that the lead time for delivery is four (4) days.2. at what point should resin be reordered? a. 0 kilograms remainingb. 50 kilograms remainingc. 200 kilograms remainingd. 400 kilograms remaininge. 500 kilograms remaining3. if order size was 1,000 kilograms of resin, what would be the length of an order cycle? a. 0.05 daysb. 4 daysc. 16 daysd. 20 dayse. 50 days4. if the order size was 1,000 kilograms of resin, what would be the average inventory level? a. 50 kilogramsb. 200 kilogramsc. 500 kilogramsd. 800 kilogramse. 1,000 kilograms5. if the order size was 1,000 kilograms of resin, what would be the daily total inventory costs, excluding the cost of the resin? a. $5b. $10c. $20d. $25e. $40
Answers: 3
You know the right answer?
When work is done by a system and no heat is added, the temperature of the system?...

Questions in other subjects: