subject
Physics, 07.02.2022 22:50 gaby06

A person lifts a package weighing 23 Kg. If she lifts it 2.8 m off the floor, what work has she done?

ansver
Answers: 3

Other questions on the subject: Physics

image
Physics, 21.06.2019 23:20, nathalyviruete
Imagine you had to physically add electrons, one at a time, to a previously neutral conductor. you add one electron very easily, but the second electron requires more work. in your initial post to the discussion, explain why this is. also, what happens to the work needed to add the third, fourth, fifth, and subsequent electrons
Answers: 1
image
Physics, 22.06.2019 14:00, jessemartinez1
This is one type of line graph in which the independent variable is time plotted on the x axis and the dependent variable, also numerical, is plotted on the y axis.
Answers: 2
image
Physics, 22.06.2019 14:30, sross8799
Suppose that 27 j of work is needed to stretch a spring from its natural length of 6 m to a length of 9 m. (a) how much work is needed to stretch the spring from 12 m to 14 m? j (b) how far beyond its natural length will a force of 78 n keep the spring stretched?
Answers: 2
image
Physics, 22.06.2019 17:30, broyochey1
Me with this and you will be marked brainliest
Answers: 2
You know the right answer?
A person lifts a package weighing 23 Kg. If she lifts it 2.8 m off the floor, what work has she done...

Questions in other subjects:

Konu
Mathematics, 21.08.2019 21:40