subject
Physics, 07.12.2021 18:40 coolkid2041

Question 4 (1 point) What type of pulley system is depicted in the image below

1-fixed pulley
2-movable pulley
3-block and tackle


Question 4 (1 point)

What type of pulley system is depicted in the image below
1-fixed pulley
2-m

ansver
Answers: 3

Other questions on the subject: Physics

image
Physics, 22.06.2019 02:50, NathalyN
An alligator swims to the left with a constant velocity of 5 \,\dfrac{\text{m}}{\text s}5 s m ? 5, space, start fraction, m, divided by, s, end fraction. when the alligator sees a bird straight ahead, the alligator speeds up with a constant acceleration of 3 \,\dfrac{\text {m}}{\text s^2}3 s 2 m ? 3, space, start fraction, m, divided by, s, start superscript, 2, end superscript, end fraction leftward until it reaches a final velocity of 35 \,\dfrac{\text {m}}{\text s}35 s m ? 35, space, start fraction, m, divided by, s, end fraction leftward. how many seconds does it take the alligator to speed up from 5 \,\dfrac{\text {m}}{\text s}5 s m ? 5, space, start fraction, m, divided by, s, end fraction to 35 \,\dfrac{\text {m}}{\text s}35 s m ? 35, space, start fraction, m, divided by, s, end fraction?
Answers: 3
image
Physics, 22.06.2019 08:20, mimithurmond03
The bubba chump shrimp company processes and packages shrimp for sale to wholesale seafood distributors. the shrimp are transported to the main plant by trucks that carry 1,000 pounds (lb) of shrimp. once the continuous flow processing of the shrimp begins, no inventory is allowed in buffers due to spoilage and all of the shrimp must be processed within 12 hours to prevent spoilage. the processing begins at the sorter, where the trucks dump the shrimp onto a conveyor belt that feeds into the sorter, which can sort up to 500 lb per hour. the shrimp then proceed to the desheller, which can process shrimp at the rate of 400 lb per hour. however, after 3 hours and 45 minutes of processing, the desheller must be stopped for 15 minutes to clean out empty shrimp shells that have accumulated. the veins of the shrimp are then removed in the deveining area at a maximum rate of 360 lb per hour. the shrimp proceed to the washing area, where they are processed at 750 lb per hour. finally, the shrimp are packaged and frozen. what is the daily process capacity of the processing plant (excluding the packaging and freezing)?
Answers: 2
image
Physics, 22.06.2019 13:40, crayons18
An ideal otto cycle has a compression ratio of 10.5, takes in air at 90 kpa and 40°c, and is repeated 2500 times per minute. using constant specific heats at room temperature, determine the thermal efficiency of this cycle and the rate of heat input if the cycle is to produce 90 kw of power.
Answers: 2
image
Physics, 22.06.2019 23:30, dragador7601
The photo above shows oil and vinegar in a pitcher. the top make a claim about about the density of the vinegar compared to the density of the oil summarize the evidence to support the claim and explain your reasoning
Answers: 3
You know the right answer?
Question 4 (1 point) What type of pulley system is depicted in the image below

1-fixed...

Questions in other subjects:

Konu
Mathematics, 04.09.2020 21:01