subject
Physics, 03.06.2021 16:30 moisescab662

A crane lifts a 100 kg concrete block to a vertical height of 25 m. Calculate the work done by the crane.

only answer if u know pls

ansver
Answers: 1

Other questions on the subject: Physics

image
Physics, 22.06.2019 08:00, cxttiemsp021
Choose each of the settings that follow and list them below do it ill mark brainliest first object= position= speed= acceleration= second object= position= speed= acceleration=
Answers: 2
image
Physics, 22.06.2019 10:00, chaseashley24
** urgent** the voltage across the primary winding is 350,000 v, and the voltage across the secondary winding is 17,500 v. if the secondary winding has 600 coils, how many coils are in the primary winding? a- 30 coilsb- 583 coilsc- 12,000 coilsd- 332,500 coils
Answers: 1
image
Physics, 22.06.2019 12:00, P4thing
Under the action of a constant force an object accelerates at 7.8 m/s2. what will the acceleration be if (a) the force is halved? (b) the object's mass is halved? (c) the force and the object's mass are both halved? (d) the force is halved and the object's mass is doubled?
Answers: 3
image
Physics, 22.06.2019 20:30, nae467
Suppose a force of 60 n is required to stretch and hold a spring 0.1 m from its equilibrium position. a. assuming the spring obeys hooke's law, find the spring constant k. b. how much work is required to compress the spring 0.5 m from its equilibrium position? c. how much work is required to stretch the spring 0.6 m from its equilibrium position? d. how much additional work is required to stretch the spring 0.1 m if it has already been stretched 0.1 m from its equilibrium? a. kequals 600
Answers: 2
You know the right answer?
A crane lifts a 100 kg concrete block to a vertical height of 25 m. Calculate the work done by the...

Questions in other subjects:

Konu
History, 04.02.2020 19:48