subject
Physics, 03.06.2021 16:30 moisescab662

A crane lifts a 100 kg concrete block to a vertical height of 25 m. Calculate the work done by the crane.

only answer if u know pls

ansver
Answers: 1

Other questions on the subject: Physics

image
Physics, 21.06.2019 19:40, 20170020
Apackage of supplies is dropped from a plane, and one second later a second package is dropped. neglecting air resistance, the relative velocity of the 1st package viewed from the second will 56) a) increase. b) be constant. c) be zero. d) depend upon their weight. e) decrease
Answers: 1
image
Physics, 22.06.2019 04:20, ellamai16
The free body diagram shows a box being pulled to the left up a 25-degree incline. the magnitude of the normal force is
Answers: 1
image
Physics, 22.06.2019 16:00, kalbaugh
Which composition of water moves to begin a deepwater current?
Answers: 2
image
Physics, 22.06.2019 19:00, Drea1385
The particle p starts from rest at point a at time t = 0 and changes its speed thereafter at a constant rate of 2.8g as it follows the horizontal path shown. determine the magnitude and direction of its total acceleration (a) just before point b, (b) just after point b, and (c) as it passes point c. state your directions relative to the x-axis shown (ccw positive) and choose the angle with the smallest magnitude.
Answers: 1
You know the right answer?
A crane lifts a 100 kg concrete block to a vertical height of 25 m. Calculate the work done by the...

Questions in other subjects: