Physics, 17.10.2019 06:50 safi30360oz0c34

At a construction site, the site manager notices that a crane takes 20 seconds to lift a 500kg steel beam up to a height of 15 meters. from this information, he calculates the power output of the crane to be what value?

ansver
Answers: 1

Other questions on the subject: Physics

image
Physics, 22.06.2019 00:50, ramosramos142
Part a constants huck finn walks at a speed of 0.60 m/s across his raft (that is, he walks perpendicular to the raft's motion what is huck's velocity (speed and direction) relative to the river bank? express your answer to three significant figures and include the appropriate units. relative to the shore)
Answers: 3
image
Physics, 22.06.2019 01:20, oliviaicono14
Un jugador de beisbol batea un foul recto en el aire. la pelota deja el bate con una rapidez de 120 km/h. en ausencia de resistencia del aire. ? cual sera la rapidez de la pelota cuando la atrape el catcher
Answers: 1
image
Physics, 22.06.2019 17:10, chloeboo
As the distance from a magnet increases, what happens to the magnet force?
Answers: 1
image
Physics, 22.06.2019 17:50, marianamartinez6
If there's a small amount of friction between two surfaces, the result could be select all that applya. no movement b. heatc. a little bit of movementd. sliding around
Answers: 2
You know the right answer?
At a construction site, the site manager notices that a crane takes 20 seconds to lift a 500kg steel...