subject
Physics, 08.10.2019 23:00 rene27

Awagon is pulled for a distance of 5 meters in 20 seconds with a work output of 75 j. what is correct unit label for power output?

ansver
Answers: 2

Other questions on the subject: Physics

image
Physics, 21.06.2019 17:00, 610055470
Asimply means that over time there was some sort of change.
Answers: 1
image
Physics, 21.06.2019 19:30, sariyamcgregor66321
Molten iron fills a mould, which has a volume of 200 cm cubed. calculate the volume when the iron cools and solidifies. molten iron has a density of 7.0g/cm cubed. in its solid state, iron has a density of 8.0g/cm cubed.
Answers: 3
image
Physics, 22.06.2019 15:00, ttorres013
Consider a uniformly charged ring in the xy plane, centered at the origin. the ring has radius a and positive charge qdistributed evenly along its circumference. a)what is the direction of the electric field at any point on the z axis? . b)what is the magnitude of the electric field along the positive z axis? use k in your answer, where k=14πϵ0. d)the ball will oscillate along the z axis between z=d and z=−d in simple harmonic motion. what will be the angular frequency ω of these oscillations? use the approximation d≪a to simplify your calculation; that is, assume that d2+a2≈a2. express your answer in terms of given charges, dimensions, and constants
Answers: 2
image
Physics, 22.06.2019 20:50, chocroc50
The second largest public utility in the nation is the sole provider of electricity in 32 counties of southern florida. to meet the monthly demand for electricity in these counties, which is given by the inverse demand function p = 1,200 – 4q, the utility company has set up two electric generating facilities: q1 kilowatts are produced at facility 1, and q2 kilowatts are produced at facility 2 (so q = q1 + q2). the costs of producing electricity at each facility are given by c1(q1) = 8,000 + 6q12 and c2(q2) = 6,000 + 3q22, respectively. determine the profit-maximizing amounts of electricity to produce at the two facilities, the optimal price, and the utility company’s profit
Answers: 3
You know the right answer?
Awagon is pulled for a distance of 5 meters in 20 seconds with a work output of 75 j. what is correc...

Questions in other subjects:

Konu
Mathematics, 09.07.2019 22:00
Konu
Social Studies, 09.07.2019 22:00
Konu
Biology, 09.07.2019 22:00