subject
Physics, 07.04.2021 05:30 alexcute965

A heavy piano is pushed up an inclined plane into a moving van. Which of the following choices best explains how the inclined plane made the task easier? 1. The force needed to move the piano up the plane was less than the force needed to lift it straight up into the van, but the distance over which the piano moved was greater.
2.The force exerted on the piano was the same as if it had been lifted, but the distance it needed to be move decreased, so the total work decreased.
3.The distance that the piano was moved was less that the distance it would have had to be lifted, so the total work decreased.
4. The amount of force need to push the piano up the ramp is the same as the force needed to lift it, so the amount of work remained the same.​

ansver
Answers: 2

Other questions on the subject: Physics

image
Physics, 21.06.2019 16:30, fatback7063
In which scenario is the least amount of work done on a crate? a force of 120 n moves it 25 m. a force of 115 n moves it 26 m. a force of 130 n moves it 22 m. a force of 125 n moves it 27 m.
Answers: 1
image
Physics, 22.06.2019 11:20, puppylove899
Wave functions describe orbitals in a hydrogen atom. each function is characterized by 3 quantum numbers: n, l, and ml. if the value of n = 2: the quantum number l can have values from to . the total number of orbitals possible at the n = 2 energy level is .
Answers: 3
image
Physics, 22.06.2019 18:30, kingindoraptor
Against his financial advisor's advice, frank has decided to invest his money in some risky stocks because he once made quite a bit of money in the stock market. his decision illustrates a. the representativeness heuristic b. overconfidence c. the availability heuristic d. confirmation bias select the best answer from the choices provided
Answers: 3
image
Physics, 22.06.2019 19:50, nadiareese
Aleaky 10-kg bucket is lifted from the ground to a height of 15 m at a constant speed with a rope that weighs 0.7 kg/m. initially the bucket contains 45 kg of water, but the water leaks at a constant rate and finishes draining just as the bucket reaches the 15-m level. find the work done. (use 9.8 m/s2 for g.) show how to approximate the required work by a riemann sum. (let x be the height in meters above the ground. enter xi* as xi.) lim n → ∞ n (9.8)(45−3 xi) i = 1 δx express the work as an integral. 0 dx evaluate the integral. (round your answer to the nearest integer.) j
Answers: 3
You know the right answer?
A heavy piano is pushed up an inclined plane into a moving van. Which of the following choices best...

Questions in other subjects:

Konu
Mathematics, 21.04.2021 18:20
Konu
Mathematics, 21.04.2021 18:20
Konu
Mathematics, 21.04.2021 18:20