subject
Physics, 20.03.2021 01:50 officialrogerfp3gf2s

120 J of work was done to lift an object 6 m above the ground. How much force was applied to this
object and what was its mass?
Select one:

120 N, 5 kg

20 N, 3.04 kg

720 N, 12.3 kg

20 N, 2.04 kg

ansver
Answers: 3

Other questions on the subject: Physics

image
Physics, 22.06.2019 08:20, mimithurmond03
The bubba chump shrimp company processes and packages shrimp for sale to wholesale seafood distributors. the shrimp are transported to the main plant by trucks that carry 1,000 pounds (lb) of shrimp. once the continuous flow processing of the shrimp begins, no inventory is allowed in buffers due to spoilage and all of the shrimp must be processed within 12 hours to prevent spoilage. the processing begins at the sorter, where the trucks dump the shrimp onto a conveyor belt that feeds into the sorter, which can sort up to 500 lb per hour. the shrimp then proceed to the desheller, which can process shrimp at the rate of 400 lb per hour. however, after 3 hours and 45 minutes of processing, the desheller must be stopped for 15 minutes to clean out empty shrimp shells that have accumulated. the veins of the shrimp are then removed in the deveining area at a maximum rate of 360 lb per hour. the shrimp proceed to the washing area, where they are processed at 750 lb per hour. finally, the shrimp are packaged and frozen. what is the daily process capacity of the processing plant (excluding the packaging and freezing)?
Answers: 2
image
Physics, 22.06.2019 12:00, JvGaming2001
In a set amount of time, a battery supplies 25j of energy to an electric circuit that includes two different loads. one of the loads produces 10 j of heat energy during this time interval. how much heat energy is produced by the second load in this time? explain your answer
Answers: 3
image
Physics, 22.06.2019 22:30, madisonvinson80
Am i correct on these two physics questions?
Answers: 2
image
Physics, 23.06.2019 00:30, PENTALIZARD2834
What is the relationship between ozone and smog?
Answers: 1
You know the right answer?
120 J of work was done to lift an object 6 m above the ground. How much force was applied to this

Questions in other subjects:

Konu
Mathematics, 14.01.2021 20:30
Konu
Mathematics, 14.01.2021 20:30
Konu
Mathematics, 14.01.2021 20:30