subject
Physics, 08.03.2021 17:50 aspenwheeler6804

a person tries to move a heavy stone of mass 100 kg for an hour but fails (a).How much worh has to be done on the stone?(b).if instead ,he ,lifts lifts it up to a height of 2m , how much work is done

ansver
Answers: 2

Other questions on the subject: Physics

image
Physics, 22.06.2019 21:10, bri9263
Two masses are connected by a rope that hangs over a pulley as shown below. the pulley is a uniform cylinder of radius 푅=0.381meters and mass 푀=3.1푘푔. initially 푚"is on the ground and 푚#rests 2.5 meters above the ground. if the system is released, use conservation of energy to determine the speed of 푚#just before it strikes the ground. assume the pulley bearing is frictionless.
Answers: 2
image
Physics, 23.06.2019 00:00, meillsss
Boiling water is an example of physical change. true or false
Answers: 2
image
Physics, 23.06.2019 09:30, pooooooooyp4286
Which would increase mechanical advantage?
Answers: 2
image
Physics, 23.06.2019 09:50, kami2006
Make a drawing of the electric field lines around a positive charge, then make a second drawing of the electric field lines around a negative charge.
Answers: 3
You know the right answer?
a person tries to move a heavy stone of mass 100 kg for an hour but fails (a).How much worh has to b...

Questions in other subjects:

Konu
History, 04.08.2019 09:30
Konu
Mathematics, 04.08.2019 09:30