subject
Physics, 19.02.2021 23:40 ahmedeldyame

A runaway train that has a mass of 67,177 kg and is travelling at a speed of 59 m/s. How much work does Superman do in slowing the train down to a controllable speed of 11 m/s?

ansver
Answers: 2

Other questions on the subject: Physics

image
Physics, 21.06.2019 20:30, trenrain
When you drop a pebble from height a it reaches the ground with speed v if there is no air resistance. from what height should you drop it so it will reach the ground with three times the speed? (a) 9m (b) 3m (c) 6m (d) 18m
Answers: 2
image
Physics, 21.06.2019 21:00, victoriazh2005
Apulley with a mechanical advantage of 5 will require you to pull times the amount of rope. a. 1/5 b. 5 c. 10 d. 15
Answers: 2
image
Physics, 21.06.2019 23:30, supernova69
In which of the following cases is work being done on an object? question 2 options: pulling a trailer up a hill carrying a box down a corridor suspending a heavy weight with a strong chain pushing against a locked door
Answers: 2
image
Physics, 22.06.2019 10:00, chaseashley24
** urgent** the voltage across the primary winding is 350,000 v, and the voltage across the secondary winding is 17,500 v. if the secondary winding has 600 coils, how many coils are in the primary winding? a- 30 coilsb- 583 coilsc- 12,000 coilsd- 332,500 coils
Answers: 1
You know the right answer?
A runaway train that has a mass of 67,177 kg and is travelling at a speed of 59 m/s. How much work d...

Questions in other subjects: