subject
Physics, 29.11.2019 14:31 shawk6230

Cientists in a test lab are testing the hardness of a surface before constructing a building. calculations indicate that the entire structure would sink by a certain amount for every additional floor that is added. if the maximum permissible limit for depression of the structure is 20 centimeters, how many floors can be safely added to the building?

ansver
Answers: 3

Other questions on the subject: Physics

image
Physics, 21.06.2019 15:20, hartzpeyton136
Two large, flat, horizontally oriented plates are parallel to each other, a distance d apart. half way betwween the two plates the electric field has magnitude e. if the separation of the plates is reduced to d/2 what is the magnitude of the electric field half way between the plates?
Answers: 2
image
Physics, 22.06.2019 03:50, gogo16732
Three different objects, all with different masses, are initially at rest at the bottom of a set of steps. each step is of uniform height . the mass of each object is a multiple of the base mass : object 1 has mass 4..00m , object 2 has mass 1..96m , and object 3 has mass . when the objects are at the bottom of the steps, define the total gravitational potential energy of the three-object system to be zero. if the objects are then relocated as shown, what is the new total potential energy of the system? each answer requires the numerical coefficient to an algebraic expression. each algebraic expression is given using some combination of the variables , , and , where is the acceleration due to gravity. enter only the numerical coefficient. (example: if the answer is 1..23mgd , just enter 1.23)
Answers: 3
image
Physics, 22.06.2019 08:00, kaylaamberd
Aheat engine running backward is called a refrigerator if its purpose is to extract heat from a cold reservoir. the same engine running backward is called a heat pump if its purpose is to exhaust warm air into the hot reservoir. heat pumps are widely used for home heating. you can think of a heat pump as a refrigerator that is cooling the already cold outdoors and, with its exhaust heat qh, warming the indoors. perhaps this seems a little silly, but consider the following. electricity can be directly used to heat a home by passing an electric current through a heating coil. this is a direct, 100% conversion of work to heat. that is, 19.0 \rm kw of electric power (generated by doing work at the rate 19.0 kj/s at the power plant) produces heat energy inside the home at a rate of 19.0 kj/s. suppose that the neighbor's home has a heat pump with a coefficient of performance of 4.00, a realistic value. note: with a refrigerator, "what you get" is heat removed. but with a heat pump, "what you get" is heat delivered. so the coefficient of performance of a heat pump is k=qh/win. an average price for electricity is about 40 mj per dollar. a furnace or heat pump will run typically 200 hours per month during the winter. what does one month's heating cost in the home with a 16.0 kw electric heater? what does one month's heating cost in the home of a neighbor who uses a heat pump to provide the same amount of heating?
Answers: 2
image
Physics, 22.06.2019 14:10, chuchi24
The number of passengers who arrive at the platform of a subway station for the 10 am train is a random variable with a mean of 120 and a variance of 16. find the lower bound of the probability that there will be between 100 and 140 passengers (round off to second decimal place).
Answers: 3
You know the right answer?
Cientists in a test lab are testing the hardness of a surface before constructing a building. calcul...

Questions in other subjects:

Konu
Mathematics, 28.01.2021 04:40