subject
Physics, 24.07.2020 18:01 dezmondpowell

A machine takes 0.5 seconds to move a brick 1 meter and put 100 Joules of energy into it. (hint: Power is the amount of energy transferred or converted per unit time. Or we say power is work done per unit time. LaTeX: P\:=\:\frac{W}{t}P = W t) This machine would expend more power in this action if it:

ansver
Answers: 3

Other questions on the subject: Physics

image
Physics, 21.06.2019 14:40, cheerthi16
A50.0-n box is sliding on a rough horizontal floor, and the only horizontal force acting on it is friction. you observe that at one instant the box is sliding to the right at and that it stops in 2.25 s with uniform acceleration. what magnitude force does friction exert on this box
Answers: 1
image
Physics, 22.06.2019 16:30, Nerdylearner8639
Is there a point between a 10 nc charge and a 20 nc charge at which the electric field is zero?
Answers: 2
image
Physics, 23.06.2019 00:20, dragongacha777
Ahypothetical metal has an orthorhombic unit cell for which the a, b, and c lattice parameters are 0.413 nm, 0.665 nm, and 0.876 nm, respectively. (a) if there are 8 atoms per unit cell and the atomic packing factor is 0.536, determine the atomic radius (in nm). (b) if the density is 3.99 g/cm3, calculate the metal's atomic weight (in g/mol).
Answers: 3
image
Physics, 23.06.2019 01:00, seonna
Which pair of quantities includes one quantity that increases as the other decreases during simple harmonic motion?
Answers: 2
You know the right answer?
A machine takes 0.5 seconds to move a brick 1 meter and put 100 Joules of energy into it. (hint: Pow...

Questions in other subjects:

Konu
Biology, 07.04.2020 01:04
Konu
Mathematics, 07.04.2020 01:04