subject
Physics, 18.07.2020 01:01 itsmemichellel

A small segment of a string under tension with a force of Fin which a pulse moves with a speed of v and show how one arrives at equation (1). Show all the details of your work.
2. Starting with the vertical position equation of a wave shown here,
y(x, t) = A sin(kx - wt)
Calculate the vertical position y in [cm], vertical speed Vy in [m/s] and vertical acceleration ay in [m/s] of the wave that the wave driver generated at x = 15 cm and at time t = 3 s during trial 5 of this experiment. Assume that A = 2 cm. The other values in the equation can be calculated from the experimental data. Remember to differentiate the above equation to get the expressions for Vy and ay.
y = 1.447 cm,
V = -4.25 m/s
a = -1372 m/s2
v=√Ft/u
Trial 225.00 Ls = cm Total string length m (e) 250 300 f3 (Hz) 36.1 39.7 43.0 L= 160.50 cm Active length mos = 3.70 Total string mass 350 400 450 500 550 49.0 51.6 mob 50.00 Mass of hanger 0.0164 U= kg/m 600 650 700 Linear density 61.3 | Trial 3 0 4 m (kg) 0.250 0.300 .350 0.400 0.450 0.500 0.550 0.600 0.650 0.700 4.04 4.15 f(Hz) f2 (Hz) 3.47 12.04 3.64 13.25 3.7914.36 3.92 15.37 16.32 17.22 4.25 18.06 18.92 4.43 19.62 4.52 20.43 4.35 10

ansver
Answers: 2

Other questions on the subject: Physics

image
Physics, 22.06.2019 04:30, cicimarie2018
Ameter stick is pivoted at the 0.50-m line. a 3.0-kg object is hung from the 0.15-m line. where should a 5.0-kg object be hung to achieve equilibrium (the meter stick oriented horizontal and motionless)?
Answers: 1
image
Physics, 22.06.2019 04:50, bella2331
Asher cycles 12 miles in 16 hours. what is his speed?
Answers: 1
image
Physics, 22.06.2019 10:00, squirrel6875
There are two-speed cameras, one in an are where the speed limit is 30 km/h and another where the speed limit is 50 km/h. in which will there be a smaller time interval between the photographs? explain your answer.
Answers: 1
image
Physics, 22.06.2019 17:00, miya214
The chart shows the costs and shipping times for materials that a company needs to build a new product. which describes the best trade-off if the company needs to start building their product within the next two years? they should order the domestic materials because it is always best to choose the fastest shipping time. they should order the imported materials because it is always best to choose the lowest cost for materials. since the shipping time is longer, they should order the domestic materials because the additional cost is worth it to get the materials in time. even though the shipping time is longer, they should order the imported materials because they are less expensive and should arrive in plenty of time to build the product.
Answers: 1
You know the right answer?
A small segment of a string under tension with a force of Fin which a pulse moves with a speed of v...

Questions in other subjects:

Konu
History, 06.03.2020 23:32