subject
Physics, 19.03.2020 23:58 blackkiki4352

A worker lifts a 20.0-kg bucket of concrete from the ground up to the top of a 25.0-m tall building. The bucket is initially at rest, but is traveling at 4.0 m/s when it reaches the top of the building. What is the minimum amount of work that the worker did in lifting the bucket

ansver
Answers: 2

Other questions on the subject: Physics

image
Physics, 22.06.2019 09:30, KieraKimball
Need asap ‼️ 20 pts which gravitational force field diagram is drawn correctly? (answers in pictures below)
Answers: 1
image
Physics, 22.06.2019 12:20, macycj8
A2.0 μf capacitor and a 4.0 μf capacitor are connected in series across a 0.827-kv potential. the charged capacitors are then disconnected from the source and connected to each other with terminals of like sign together. find the voltage across each capacitor.
Answers: 2
image
Physics, 22.06.2019 17:40, honestty21
Which component of the earth’s atmosphere is decreased due to photosynthesis?
Answers: 1
image
Physics, 23.06.2019 07:30, kingfptduong
Which of the following characteristics is fixed, or definite, for all states of matter?
Answers: 2
You know the right answer?
A worker lifts a 20.0-kg bucket of concrete from the ground up to the top of a 25.0-m tall building....

Questions in other subjects: