subject
Physics, 02.03.2020 23:55 Navi18

A construction crane lifts a prestressed concrete beam weighing 14 short tons from the ground to the top of piers that are 24 ft above the ground. Determine the amount of work done considering the beam. Take the value of g as 32.174 ft/s2.

ansver
Answers: 2

Other questions on the subject: Physics

image
Physics, 22.06.2019 15:20, mjwaple57
Acarpenter builds an exterior house wall with a layer of wood 2.9 cm thick on the outside and a layer of styrofoam insulation 2.3 cm thick on the inside wall surface. the wood has k=0.080w/(m⋅k), and the styrofoam has k= 0.010 w/(m⋅k). the interior surface temperature is 19.0 ∘c , and the exterior surface temperature is -15.0 ∘c . a.)what is the temperature at the plane where the wood meets the styrofoam? celsius b.)what is the rate of heat flow per square meter through this wall? /m^2
Answers: 2
image
Physics, 22.06.2019 17:30, giraffegurl
Distinguish between linear momentum and angular momentum
Answers: 2
image
Physics, 22.06.2019 18:30, raywalker3410
Adisk with a radius of r is oriented with its normal unit vector at an angle q with respect to a uniform electric field. which of the following would result in an increase in the electric flux through the disk? check all that apply? a. increasing the area of the disk b. decreasing the given orientation angle of the disk c. decreasing the strength of the electric field d. increasing the given orientation angle of the disk, but not exceeding an angle of 90
Answers: 1
image
Physics, 23.06.2019 02:00, Ron1213
How does changing the frequency affect the energy of the wave?
Answers: 3
You know the right answer?
A construction crane lifts a prestressed concrete beam weighing 14 short tons from the ground to the...

Questions in other subjects:

Konu
Mathematics, 25.09.2019 01:00