Physics, 22.02.2020 03:59 hardwick744
A manual assembly line has 25 workstations and the manning level is 1.0. The work content time to assemble the product is 29.5 min. Production rate of the line is 40 units/hr. The proportion uptime is 96% and the repositioning time is 9 sec. Determine the balance delay on the line
![ansver](/tpl/images/cats/User.png)
Answers: 2
![](/tpl/images/ask_question.png)
![](/tpl/images/ask_question_mob.png)
Other questions on the subject: Physics
![image](/tpl/images/cats/fizika.png)
![image](/tpl/images/cats/fizika.png)
Physics, 23.06.2019 02:50, raekwonpowell10
Orque can be calculated by multiplying the force (n) applied at 90∘ to the lever arm at a distance (m) from the pivot point (point of rotation), the compound si unit for the torque is n⋅m. if the force (at 90∘ to the lever arm) applied is 15 n and it is applied at 2.0 m from the pivot point (point of rotation), what is the torque on the lever?
Answers: 2
![image](/tpl/images/cats/fizika.png)
![image](/tpl/images/cats/fizika.png)
Physics, 23.06.2019 05:10, richardharding
For those who need theses answers i just took the test and got everyone of them
Answers: 3
You know the right answer?
A manual assembly line has 25 workstations and the manning level is 1.0. The work content time to as...
Questions in other subjects:
![Konu](/tpl/images/cats/mat.png)
Mathematics, 26.01.2021 06:30
![Konu](/tpl/images/cats/istoriya.png)
![Konu](/tpl/images/cats/mat.png)
Mathematics, 26.01.2021 06:30
![Konu](/tpl/images/cats/mat.png)
Mathematics, 26.01.2021 06:30
![Konu](/tpl/images/cats/en.png)
![Konu](/tpl/images/cats/en.png)
English, 26.01.2021 06:30
![Konu](/tpl/images/cats/en.png)
English, 26.01.2021 06:30
![Konu](/tpl/images/cats/obshestvoznanie.png)
![Konu](/tpl/images/cats/mat.png)
Mathematics, 26.01.2021 06:30
![Konu](/tpl/images/cats/fizika.png)
Physics, 26.01.2021 06:30