subject
Physics, 22.02.2020 03:59 hardwick744

A manual assembly line has 25 workstations and the manning level is 1.0. The work content time to assemble the product is 29.5 min. Production rate of the line is 40 units/hr. The proportion uptime is 96% and the repositioning time is 9 sec. Determine the balance delay on the line

ansver
Answers: 2

Other questions on the subject: Physics

image
Physics, 22.06.2019 23:40, naomi5321
A2.50 × 105 w motor is used for 26.4 s to pull a boat straight toward shore. how far does the boat move toward shore if a force of 4.20 × 104 n is applied by the motor?
Answers: 2
image
Physics, 23.06.2019 02:50, raekwonpowell10
Orque can be calculated by multiplying the force (n) applied at 90∘ to the lever arm at a distance (m) from the pivot point (point of rotation), the compound si unit for the torque is n⋅m. if the force (at 90∘ to the lever arm) applied is 15 n and it is applied at 2.0 m from the pivot point (point of rotation), what is the torque on the lever?
Answers: 2
image
Physics, 23.06.2019 03:20, mikayla62
If you divide a speed in miles per minute by 60, you get the same speed expressed in miles
Answers: 2
image
Physics, 23.06.2019 05:10, richardharding
For those who need theses answers i just took the test and got everyone of them
Answers: 3
You know the right answer?
A manual assembly line has 25 workstations and the manning level is 1.0. The work content time to as...

Questions in other subjects:

Konu
Mathematics, 26.01.2021 06:30
Konu
Mathematics, 26.01.2021 06:30