Aconcrete pump of 120-cy/hr max. output is used to place 250 cy of concrete. it is supplied by 8 cy transit-mix trucks arriving to the site every 15 mins. barring interruptions how many hours will the operation require, considering 80% efficiency factor.

ansver
Answers: 3

Other questions on the subject: Physics

image
Physics, 21.06.2019 20:30, trenrain
When you drop a pebble from height a it reaches the ground with speed v if there is no air resistance. from what height should you drop it so it will reach the ground with three times the speed? (a) 9m (b) 3m (c) 6m (d) 18m
Answers: 2
image
Physics, 22.06.2019 08:50, cristian901997
Mga halaman/punong ornamental na di namumulaklak
Answers: 1
image
Physics, 23.06.2019 02:00, nativebabydoll35
Frequency of electromagnetic waves that a radio station is assigned. what do you call this type of wave?
Answers: 2
image
Physics, 23.06.2019 05:00, sandram74691
City b is south of city a, and the 200 mile trip by car takes 4 hours. the cities are 120 miles apart in a straight line. what is the velocity of a trip from city a to city b?
Answers: 2
You know the right answer?
Aconcrete pump of 120-cy/hr max. output is used to place 250 cy of concrete. it is supplied by 8 cy...

Questions in other subjects: