Suppose that the amount of time it takes to build a highway varies directly with the length of the highway and inversely with the number of workers. suppose also that it takes 200 workers 3 weeks to build 2 miles of highway. how many miles of highway could 250 workers build in 6 weeks?

ansver
Answers: 2

Other questions on the subject: Physics

image
Physics, 21.06.2019 20:20, jazmaine1217
When many atoms are split in a chain reaction, a large explosion occurs. this is an example of what type of energy conservation
Answers: 2
image
Physics, 21.06.2019 22:30, starreee
Acricket ball of 70g moving with a velocity of 0.5 m/s is stopped by a player in 0.5s what is the force applied to stop the ball
Answers: 1
image
Physics, 22.06.2019 12:20, drewefielder6198
Which of the following situations is impossible? a) an object has velocity directed east and acceleration directed east. b) an object has zero velocity but non-zero acceleration. c) an object has constant non-zero velocity and changing acceleration. d) an object has velocity directed east and acceleration directed west. e) an object has constant non-zero acceleration and changing velocity.
Answers: 2
image
Physics, 22.06.2019 16:20, brittanysanders
What is the mass of the water that is being heated? it requires 2,500 joules to raise a certain amount of water (c = 4.186 jig c) from 20.0°c to 60.0°c. o 159 o 40 g o 63 g o 80 g
Answers: 2
You know the right answer?
Suppose that the amount of time it takes to build a highway varies directly with the length of the h...