Aproject requires 40,000 cy of compacted fill that must be completed in 32 working days. the fill material will be hauled to the site in 21 cy loose measure trucks. the cycle time for a truck is 40 min. per trip. the swell factor for the earth is 25% and the shrinkage factor is 10%. assume 8 hours per day and a 45-min. effective hour. determine the number of required trucks to complete the project in 32 days.

ansver
Answers: 1

Other questions on the subject: Physics

image
Physics, 22.06.2019 21:50, dzaugmavericks9145
To fully describe the photoelectric effect, scientists must consider which of the following to be quantized? o a. both light and matter o b. matter only o c. light only o d. neither light nor matter
Answers: 2
image
Physics, 22.06.2019 22:00, petroale000
Awhite-blue star is hotter than a red star. select the best answer from the choices provided true or false
Answers: 2
image
Physics, 23.06.2019 00:30, Dmgirl123
What is the relationship between globular clusters and the milky way?
Answers: 1
image
Physics, 23.06.2019 01:20, dontcareanyonemo
Afisherman notices that his boat is moving up and down periodically, owing to waves on the surface of the water. it takes a time of 2.70 s for the boat to travel from its highest point to its lowest, a total distance of 0.700 m. the fisherman sees that the wave crests are spaced a horizontal distance of 6.50 m apart. a. how fast are the waves traveling? b. what is the amplitude a of each wave?
Answers: 1
You know the right answer?
Aproject requires 40,000 cy of compacted fill that must be completed in 32 working days. the fill ma...

Questions in other subjects:

Konu
Chemistry, 27.09.2019 05:00
Konu
Mathematics, 27.09.2019 05:00
Konu
Chemistry, 27.09.2019 05:00