subject
Physics, 16.10.2019 03:00 twistedhyperboles

Acord is used to vertically lower an initially stationary block of mass m = 9.1 kg at a constant downward acceleration of g/9. when the block has fallen a distance d = 4.6 m, find (a) the work done by the cord's force on the block, (b) the work done by the gravitational force on the block, (c) the kinetic energy of the block, and (d) the speed of the block. (note : take the downward direction positive)

ansver
Answers: 2

Other questions on the subject: Physics

image
Physics, 22.06.2019 05:30, kolibeilfuss
What is the most useful equation for electric power?
Answers: 3
image
Physics, 22.06.2019 13:50, heatherlemaster
The magnitude of the poynting vector of a planar electromagnetic wave has an average value of 0.939 w/m^2 . the wave is incident upon a rectangular area, 1.5 m by 2.0 m, at right angles. how much total electromagnetic energy falls on the area during 1.0 minute?
Answers: 2
image
Physics, 22.06.2019 14:40, akitchen10
A5 foot by 5 foot box culvert is buried 6 feet beneath the surface of the ground. a crosssection of this very long culvert (into and out of the page) is illustrated below. assume that the soil in which the culvert is buried has the following properties: jt = 120 pcf, w = 12%, ko = 0.50, ka = 0.33, and kp = 3.00. calculate the total horizontal force per unit length of culvert (fh) felt on one of the vertical faces of the culvert.
Answers: 1
image
Physics, 22.06.2019 17:00, StupidFatChipmunk
What equation is used to calculate the weight of an object on a plant ?
Answers: 1
You know the right answer?
Acord is used to vertically lower an initially stationary block of mass m = 9.1 kg at a constant dow...

Questions in other subjects: