subject
Physics, 15.10.2019 02:30 danielcano12281621

Asled of mass 80 kg starts from rest and slides down an 18° incline 90 m long. it then travels for 20 m horizontally before starting back up a 16° incline. it travels 90 m along this incline before coming to rest. what is the net work done (in j) on the sled by friction?

ansver
Answers: 3

Other questions on the subject: Physics

image
Physics, 22.06.2019 02:00, edsimms21111
In which of the following cases is work being done on an object? question 2 options: pushing against a locked door carrying a box down a corridor pulling a trailer up a hill suspending a heavy weight with a strong chain
Answers: 2
image
Physics, 22.06.2019 08:30, lovebunfan
What is the primary force that suspension bridges use cables to hold their spans up? a. tension force b. resistance force c. normal force d. elastic force e. applied force
Answers: 3
image
Physics, 22.06.2019 09:40, dakshshberry
Asatellite component is in the shape of a cube with 10cm edges, has an evenly distributed mass of 2 kg and one bolt hole at each of four corners. if the maximum predicted random vibration environment is 10 grms, what bolt size would be a good choice for restraint? what other factors might drive bolt size besides force/stress?
Answers: 2
image
Physics, 22.06.2019 14:30, livagrace
Which compound is held together by the electrostatic force between two ions? a. co2 b. cci4 c. h2s d. mgf2
Answers: 1
You know the right answer?
Asled of mass 80 kg starts from rest and slides down an 18° incline 90 m long. it then travels for 2...

Questions in other subjects: