An assembly line with 17 tasks is to be balanced. the longest task is 2.4 minutes, and the total time for all tasks is 18 minutes. the line will operate for 450 minutes per day. a. what are the minimum and maximum cycle times? b. what range of output is theoretically possible for the line? c. what is the minimum number of work stations needed if the maximum output rate is to be sought? d. what cycle time will provide an output rate of 125 units per day? e. what output potential will result if the cycle time is (1) 9 minutes? (2) 15 minutes?
Answers: 2
Physics, 22.06.2019 03:00, chastynpatrick
If it takes a planet 2.8 x 10^8 s to orbit a star with a mass of 6.2 x 10^30 kg what is the average distance between the planet and the star
Answers: 3
An assembly line with 17 tasks is to be balanced. the longest task is 2.4 minutes, and the total tim...
Mathematics, 21.02.2020 08:17
Mathematics, 21.02.2020 08:17
Mathematics, 21.02.2020 08:17
Mathematics, 21.02.2020 08:18
Mathematics, 21.02.2020 08:18
Mathematics, 21.02.2020 08:19
Mathematics, 21.02.2020 08:19
Social Studies, 21.02.2020 08:19