subject
Physics, 16.07.2019 05:20 avaleasim

An assembly line with 17 tasks is to be balanced. the longest task is 2.4 minutes, and the total time for all tasks is 18 minutes. the line will operate for 450 minutes per day. a. what are the minimum and maximum cycle times? b. what range of output is theoretically possible for the line? c. what is the minimum number of work stations needed if the maximum output rate is to be sought? d. what cycle time will provide an output rate of 125 units per day? e. what output potential will result if the cycle time is (1) 9 minutes? (2) 15 minutes?

ansver
Answers: 2

Other questions on the subject: Physics

image
Physics, 22.06.2019 03:00, chastynpatrick
If it takes a planet 2.8 x 10^8 s to orbit a star with a mass of 6.2 x 10^30 kg what is the average distance between the planet and the star
Answers: 3
image
Physics, 22.06.2019 12:30, gemouljr
What’s #16 asking and how do i solve it?
Answers: 2
image
Physics, 22.06.2019 16:00, kalbaugh
Which composition of water moves to begin a deepwater current?
Answers: 2
image
Physics, 22.06.2019 18:20, meg12331
An object dropped from cliff falls with a constant acceleration of 10 metre per second square find its speed of two seconds after it was dropped
Answers: 2
You know the right answer?
An assembly line with 17 tasks is to be balanced. the longest task is 2.4 minutes, and the total tim...

Questions in other subjects:

Konu
Mathematics, 21.02.2020 08:17
Konu
Mathematics, 21.02.2020 08:17
Konu
Mathematics, 21.02.2020 08:18