subject
Physics, 30.06.2019 03:20 BIKRAMlawati5544

An eight - lane freeway (four lanes in each direction) is on rolling terrain and has 11 - ft lanes with a 4 - ft right shoulder. the total ramp density is 1.5 ramps per mile. the directional peak - hour traffic volume is 5400 vehicles with 6% large trucks and 5% buses (no rvs ). the traffic stream consists of regular users and the peak - hour factor is 0.90. it has been decided that large trucks will be banne d from the freeway during the peak hour. what will the freeway’s density and level of service be before and after the ban? assume that the trucks are removed and all other traffic attributes are unchanged.

ansver
Answers: 3

Other questions on the subject: Physics

image
Physics, 21.06.2019 23:30, reggiegilbert1995
Which simple machine is not part of this compound machine? a. lever b. pulley c. inclined plane d. wheel and axle
Answers: 1
image
Physics, 22.06.2019 06:40, PerfectMagZ
Alinearly polarized electromagnetic wave has an average intensity of 196 w/m^2. this wave is directed towards two ideal polarizers (in real polarizers, transmission is also effected by reflection and absorption). polarizer a is oriented with its transmission axis at an angle of θ_1=20.8∘ with the incident electric field. polarizer b has its axis at an angle of θ_2=63.0∘ with the incident electric field. what is the average intensity of the wave after it passes through polarizer a? what is the average intensity of the wave after it passes through polarizer b? suppose that the two polarizers a and b are interchanged. what would the average intensity be after passing through both polarizers?
Answers: 2
image
Physics, 22.06.2019 08:20, mimithurmond03
The bubba chump shrimp company processes and packages shrimp for sale to wholesale seafood distributors. the shrimp are transported to the main plant by trucks that carry 1,000 pounds (lb) of shrimp. once the continuous flow processing of the shrimp begins, no inventory is allowed in buffers due to spoilage and all of the shrimp must be processed within 12 hours to prevent spoilage. the processing begins at the sorter, where the trucks dump the shrimp onto a conveyor belt that feeds into the sorter, which can sort up to 500 lb per hour. the shrimp then proceed to the desheller, which can process shrimp at the rate of 400 lb per hour. however, after 3 hours and 45 minutes of processing, the desheller must be stopped for 15 minutes to clean out empty shrimp shells that have accumulated. the veins of the shrimp are then removed in the deveining area at a maximum rate of 360 lb per hour. the shrimp proceed to the washing area, where they are processed at 750 lb per hour. finally, the shrimp are packaged and frozen. what is the daily process capacity of the processing plant (excluding the packaging and freezing)?
Answers: 2
image
Physics, 22.06.2019 23:00, rtryf57rfgth
Which wave is the result of amplification and produces a louder sound
Answers: 1
You know the right answer?
An eight - lane freeway (four lanes in each direction) is on rolling terrain and has 11 - ft lanes w...

Questions in other subjects:

Konu
Mathematics, 04.06.2021 19:40
Konu
Mathematics, 04.06.2021 19:40