subject
Physics, 05.11.2019 13:31 stmy1969

Aleaky 10-kg bucket is lifted from the ground to a height of 16 m at a constant speed with a rope that weighs 0.7 kg/m. initially the bucket contains 48 kg of water, but the water leaks at a constant rate and finishes draining just as the bucket reaches the 16-m level. find the work done. (use 9.8 m/s2 for g.) show how to approximate the required work by a riemann sum. (let x be the height in meters above the ground. enter xi* as xi.)

ansver
Answers: 3

Other questions on the subject: Physics

image
Physics, 21.06.2019 15:50, gobbler80
Which instrument is used to measure air temperature
Answers: 2
image
Physics, 21.06.2019 17:30, Bladen6579
Abaseball picther can throw a ball at about 90 miles per hour, v = 40 m/s, on solid rock ground. we now put him into space. when he throws the ball, which weighs mb = 0.15 kg moves away from himat the same speed. how long does it take the ball thrown in space to travel the 30 meters to the batter? he weighs mp = 100kg
Answers: 1
image
Physics, 21.06.2019 19:00, dasiaflowers85
When the velocity of an object is doubled, by what factor is its momentum changed? by what factor is its kinetic energy changed? a) the momentum is zero. b) the momentum is not zero. c) difficult to say.
Answers: 3
image
Physics, 22.06.2019 11:30, tommyaberman
You've already seen the value of 9.8 in this lesson. what's this value called? what quantity does it represent?
Answers: 2
You know the right answer?
Aleaky 10-kg bucket is lifted from the ground to a height of 16 m at a constant speed with a rope th...

Questions in other subjects:

Konu
English, 21.05.2021 02:20
Konu
English, 21.05.2021 02:20