subject
Mathematics, 23.07.2019 19:30 juli8350

Aconstruction crew is lengthening a road. the road started with a length of 57 miles, and the crew is adding 4 miles to the road each day. let l represent the total length of the road (in miles), and let d represent the number of days the crew has worked. write an equation relating l to d . then use this equation to find the total length of the road after the crew has worked 31 days.

ansver
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 14:30, stupidjew5496
Two rigid transformations are used to map abc to qrs. the first is a translation of vertex b to vertex r. what is the second transformation? a reflection across the line containing ab a rotation about point b a reflection across the line containing cb a rotation about point c
Answers: 2
image
Mathematics, 21.06.2019 15:20, angelbabynn05
Abcd ≅ klmn ≅ pqrs ≅ wxyz given that information, which figures are reflections of abcd?
Answers: 1
image
Mathematics, 21.06.2019 18:30, Lakenwilliams1250
Select 2 statements that are true about the equation y+6=-10(x-3).1) the slope of the line is -102) the slope of the line is 33) one point on the line is (3,6)4) one point on the line is (3,-6)
Answers: 1
image
Mathematics, 21.06.2019 19:30, sofiisabella10
If you can solve all of these i will give ! - 4% of 190 - 4% of 162.5 - 4% of 140 - a 4% increase from 155.1 - a 4% increase from 159.8
Answers: 2
You know the right answer?
Aconstruction crew is lengthening a road. the road started with a length of 57 miles, and the crew i...

Questions in other subjects:

Konu
Mathematics, 20.01.2021 21:50
Konu
Mathematics, 20.01.2021 21:50
Konu
History, 20.01.2021 21:50