9workers working 8 hours a day to complete a piece of work in 52 days. how long will it take 13 workers to complete the same job by working 6 hours a day? show all the steps. correct answer will get brainliest

ansver
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 16:30, sydthekid9044
Divide the following fractions 3/4 ÷ 2/3 1/2 8/9 9/8 2
Answers: 2
image
Mathematics, 21.06.2019 18:30, darlene1283
Thales was an ancient philosopher familiar with similar triangles. one story about him says that he found the height of a pyramid by measuring its shadow and his own shadow at the same time. if the person is 5-ft tall, what is the height of the pyramid in the drawing?
Answers: 3
image
Mathematics, 21.06.2019 20:30, destinyharris8502
I’m on question 7 it says a covered water tank is in the shape of a cylinder the tank has a 28 inch diameter and a height of 66 inches to the nearest square inch what is the surface area of the water tank
Answers: 2
image
Mathematics, 21.06.2019 21:30, mcaninch36
Scott’s bank account showed a balance of $750 on sunday. during the next five days, he made one deposit of $140 and numerous withdrawals of $180 each. let x represent the number of withdrawals that scott made. write an inequality that can be used to find the maximum number of withdrawals that scott could have made and maintain a balance of at least $100. do not use a dollar sign ($) in your response.
Answers: 1
You know the right answer?
9workers working 8 hours a day to complete a piece of work in 52 days. how long will it take 13 work...

Questions in other subjects:

Konu
Mathematics, 21.05.2021 20:10
Konu
Chemistry, 21.05.2021 20:10
Konu
Mathematics, 21.05.2021 20:10