subject
Mathematics, 29.07.2019 01:20 cg20061107

The time it takes to mow the lawn at a large park m(x) varies inversely with the number of workers assigned to the job x it takes 90 minutes to complete the job when three workers are assigned to it. which equation can be used to find the time to complete job when its workers are assigned to it? a. m(x)=279/xb. m(x)=270xc. m(x)=30/xd. m(x)=30x

ansver
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 18:30, makayyafreeman
Solve the inequality and graph 6j - 7 < 5
Answers: 1
image
Mathematics, 22.06.2019 02:00, shandrablue9348
Hannah reads at a constant rate of 33 pages every 88 minutes. write an equation that shows the relationship between pp, the number of pages she reads, and mm, the number of minutes she spends reading.
Answers: 1
image
Mathematics, 22.06.2019 02:00, ballbritez
Student representatives surveyed their classmates on their preference of a school mascot for a new school. the results are shown in the table below. which pair of samples seems most representative of student preference?
Answers: 2
image
Mathematics, 22.06.2019 02:00, BeenPaidGLO
Aflagpole broke in a storm. 77 7 meters are still sticking straight out of the ground, where it snapped, but the remaining piece has hinged over and touches the ground at a point 2424 24 meters away horizontally
Answers: 1
You know the right answer?
The time it takes to mow the lawn at a large park m(x) varies inversely with the number of workers a...

Questions in other subjects:

Konu
Mathematics, 03.12.2019 19:31