subject
Mathematics, 26.07.2019 04:40 shyannmcmahon29991

Brett can plow out all the driveways on his street with his new four-wheel-drive truck in 33 hours. using a snow blade on a lawn tractor, his neighbor can plow out the same number of driveways in 77 hours. how long would it take them to do the work together?

ansver
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 19:00, 592400014353
The test scores of 32 students are listed below. construct a boxplot for the data set and include the values of the 5-number summary. 32 37 41 44 46 48 53 55 57 57 59 63 65 66 68 69 70 71 74 74 75 77 78 79 81 82 83 86 89 92 95 99
Answers: 1
image
Mathematics, 21.06.2019 19:00, Pookaapoo8832
For what value of (y) is 3^3/3^y =1/9
Answers: 1
image
Mathematics, 21.06.2019 21:40, arubright177
The tile along the edge of a triangular community pool needs to be replaced? ?
Answers: 2
image
Mathematics, 21.06.2019 23:30, kaziyahf2006
Which two fractions are equivalent to 6/11? 6/22 and 18/33 12/22 and 18/33 12/22 and 18/22 3/5 and 6/10
Answers: 1
You know the right answer?
Brett can plow out all the driveways on his street with his new four-wheel-drive truck in 33 hours....

Questions in other subjects:

Konu
Computers and Technology, 26.08.2021 04:50
Konu
English, 26.08.2021 04:50
Konu
History, 26.08.2021 04:50