Mathematics, 13.07.2019 21:40 jaiyaharoldjh
Suppose one worker can assemble 2 machine parts in 30 minutes. a customer building a new factory needs 832 parts. they want the parts on monday to fit with their assembly schedule. you agree to a partial delivery each day in order to minimize the amount of extra workers needed to complete the order while meeting the customer's needs. the machine parts will be delivered according to the schedule shown. how many workers would you assign to the job to maximize efficiency and minimize cost?
Answers: 1
Mathematics, 21.06.2019 14:00, payloo
Alex drew a circle with right triangle prq inscribed in it, as shown below: the figure shows a circle with points p, q, and r on it forming an inscribed triangle. side pq is a chord through the center and angle r is a right angle. arc qr measures 80 degrees.
Answers: 2
Mathematics, 21.06.2019 14:00, ladnerhailey16
F(x) = (x^2 + 3x − 4) and g (x) = (x+4) find f/g and state the domain.
Answers: 1
Mathematics, 21.06.2019 15:30, kaelyynn752
Iwill give brainliest only if your correct the words subsequent and submerge both contain the prefix sub. based on this information, what does the prefix sub most likely mean? a) under or secondary b) true or verifiable c) tricky or difficult d) around or centered on
Answers: 1
Suppose one worker can assemble 2 machine parts in 30 minutes. a customer building a new factory nee...
History, 06.12.2021 23:20
Spanish, 06.12.2021 23:20
Geography, 06.12.2021 23:20
Mathematics, 06.12.2021 23:20
Mathematics, 06.12.2021 23:20
Social Studies, 06.12.2021 23:20
Biology, 06.12.2021 23:20