subject
Mathematics, 18.03.2022 08:10 Weser17

A study of the amount of time it takes a specialist to repair a mobile MRI shows that the mean is 8. 4 hours and the standard deviation is 1. 8 hours. If a broken mobile MRI is randomly selected, find the probability that its mean repair time is less than 8. 9 hours

ansver
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 22.06.2019 03:00, kers
Let us imagine that the number of automobile accidents in a certain region are related to the regional number of registered automobiles in tens of thousands (b1), alcoholic beverage sales in $10,000 (b2), and decrease in the price of gasoline in cents (b3). furthermore, imagine that the regression formula has been calculated as: y = a + b1x1 + b2x2 + b3x3 where y = the number of automobile accidents, a = 7.5, b1 = 3.5, b2 = 4.5, and b3 = 2.5 calculate the expected number of automobile accidents for a football weekend if the region has 25,000 registered vehicles, $75,000 worth of beer is sold, and a gas war causes a 10 cent drop in a gallon of gas.
Answers: 3
image
Mathematics, 22.06.2019 04:20, bellabarfield4286
Place the indicated product in the proper location on the grid. -4x3y2(7xy4)
Answers: 2
image
Mathematics, 22.06.2019 06:40, animationfusion
Mobon oil company owns a lease that entitles it to explore for oil on a parcel of offshore land in california. since the lease is about to expire mobon must now decide whether to drill for oil at the site or to sell the lease to excel oil company, which has just offered mobon $50,000. mobon estimates it would cost $100,000 to drill at the site. if the well were dry, all this cost would be lost. if the well were successful, its value to mobon would depend on the extent of the oil discovered. for simplicity, mobon assumes there are only two types of successful wells: minor and major success. mobon estimates that a minor success would result in revenues of $200,000 in excess of the drilling cost, whereas a major success would result in revenue of $500,000 in excess of the drilling cost. mobon has assessed the following probabilities: if the well is dry then the probability is 0.7, if it is a minor success the probability is 0.2, and if it is a major success the probability is 0.1. a) construct an appropriate payoff matrix, b) using the maximax criterion, identify the optimal decision c) using the maximin criterion, identify the optimal decision d) using the minimax criterion, identify the optimal decision e) using the emv criterion, identify the optimal decision
Answers: 1
image
Mathematics, 22.06.2019 08:00, ernestinebell3514
Sandra wants to evaluate 2 cot her work is shown below. what did she do wrong?
Answers: 1
You know the right answer?
A study of the amount of time it takes a specialist to repair a mobile MRI shows that the mean is 8....

Questions in other subjects: