subject
Mathematics, 14.02.2022 14:00 abigail2403

. A construction company can remove 4 4 1 / 1 3 metric tons of dirt from a construction site in 3 8 hours. What is the unit rate in metric tons per hour? Write your answer as a fraction or a mixed number in simplest form. URGENT

ansver
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 15:00, kkruvc
Ascatterplot is produced to compare the size of a school building to the number of students at that school who play an instrument. there are 12 data points, each representing a different school. the points are widely dispersed on the scatterplot without a pattern of grouping. which statement could be true
Answers: 1
image
Mathematics, 21.06.2019 15:30, ur4286
The triangles are similar. what is the value of x? show your work.
Answers: 1
image
Mathematics, 21.06.2019 16:30, cxttiemsp021
Which approach to the theory-and-research cycle does the following sequence reflect: (1) specific observations suggest generalizations, (2) generalizations produce a tentative theory, (3) the theory is tested through the formation of hypotheses, and (4) hypotheses may provide suggestions for additional observations?
Answers: 1
image
Mathematics, 21.06.2019 20:20, kenken2583
Complete the input-output table for the linear function y = 3x. complete the input-output table for the linear function y = 3x. a = b = c =
Answers: 2
You know the right answer?
. A construction company can remove 4 4 1 / 1 3 metric tons of dirt from a construction site in 3 8...

Questions in other subjects:

Konu
Mathematics, 17.02.2021 01:00
Konu
Biology, 17.02.2021 01:00
Konu
Biology, 17.02.2021 01:00