subject
Mathematics, 06.02.2022 14:00 levicorey846

A mining company owns two mines. These mines produce an ore that can be graded into two classes : regular grade and low grade. The company must produce at least 420 tons of regular-grade and 540 tons of low-grade ore per week. The first mine produces 6 tons of regular-grade and 18 tons of low-grade ore per
hour. The second mine produces 18 tons of regular-grade and 9 tons of low-grade ore per hour. The operating cost of the first mine is $26.000 per hour, and the
operating cost of the second mine is $12,500 per hour. The first mine can be operated no more than 40 hours a week, and the second mine can be operated no
more than 38 hours a week. How many hours per week should each mine be operated to minimize the cost?

ansver
Answers: 3

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 15:30, Fireburntbudder
If x + 10 = 70, what is x? a. 40 b. 50 c. 60 d. 70 e. 80
Answers: 2
image
Mathematics, 21.06.2019 17:00, Calvinailove13
An air conditioning system can circulate 350 cubic feet of air per minute. how many cubic yards of air can it circulate per minute?
Answers: 3
image
Mathematics, 22.06.2019 00:30, sjamelia
Write the factored form of this trinomial 9x^2+18x-7
Answers: 3
image
Mathematics, 22.06.2019 03:30, laylaaaaah1603
Which of the following is true about the following construction of a tangent to a circle from a point outside of the circle?
Answers: 3
You know the right answer?
A mining company owns two mines. These mines produce an ore that can be graded into two classes : re...

Questions in other subjects:

Konu
Mathematics, 23.09.2019 18:00