subject
Mathematics, 11.01.2022 16:10 pc103919

PLEASE HELP ASAP A special piece of equipment is used at a construction site to dig holes. A hole is dug to a depth of 3.25 feet when the equipment hits rock. The progress slows to 5/8 feet per hour of digging. The depth of the hole must be at least 11 1/2 feet by the end of the day to stay on schedule.

What is the minimum amount of time the equipment must continue at its present rate to complete the hole on schedule?

ansver
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 16:00, mncampbell01
Answer asap ! the shortest path from point a to point b goes through a pond. to avoid the pond, you must walk straight 34 meters along one edge of the pond, then take a 90 degree turn, and again walk straight 41 meters along another edge of the pond to reach point b. about how many meters would be saved if it were possible to walk through the pond? a. 11 m b. 20 m c. 30.45 m d. 21.73 m
Answers: 1
image
Mathematics, 21.06.2019 21:30, gigglegirl5802
Select all the statements that apply to this figure
Answers: 2
image
Mathematics, 21.06.2019 22:00, kkeith121p6ujlt
5. (03.02)if g(x) = x2 + 3, find g(4). (2 points)1619811
Answers: 1
image
Mathematics, 22.06.2019 00:00, daphnevlogs11
Which diagram shows lines that must be parallel lines cut by transversal?
Answers: 3
You know the right answer?
PLEASE HELP ASAP A special piece of equipment is used at a construction site to dig holes. A hole...

Questions in other subjects:

Konu
English, 16.01.2021 23:00