subject
Mathematics, 14.12.2021 08:50 EndiaGracee

HELP A construction company takes 1/8 hours to remove 1/2 metric tons of dirt from a construction site. What is the unit rate in metric tons per hour? Write your answer in the simplest form.

ansver
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 18:00, kcameronanderso
Liz is shipping a package to her friend. the maximum weight of a medium flat-rate box is 20 pounds, including the box which weighs 6 ounces. write and solve an inequality to describe the possible weight ,w, of the contents that liz will ship to her friend if she must use a medium flat-rate box.
Answers: 2
image
Mathematics, 21.06.2019 21:30, coontcakes
Acd that is originally priced at $15.85 red-tagged for the sale. what is the sale price of the cd
Answers: 1
image
Mathematics, 21.06.2019 21:30, gigglegirl5802
Select all the statements that apply to this figure
Answers: 2
image
Mathematics, 21.06.2019 22:30, renaudciera
Use the following statements to write a compound statement for the conjunction or disjunction. then find its truth value. p: an isosceles triangle has two congruent sides. q: a right angle measures 90° r: four points are always coplanar. s: a decagon has 12 sides. a) a right angle measures 90° or an isosceles triangle has two congruent sides; true. b) a right angle measures 90° and an isosceles triangle has two congruent sides; true. c) a right angle measures 90° and an isosceles triangle does not have two congruent sides; false. d) a right angle measures 90° or an isosceles triangle does not have two congruent sides; true.
Answers: 3
You know the right answer?
HELP A construction company takes 1/8 hours to remove 1/2 metric tons of dirt from a construction...

Questions in other subjects:

Konu
English, 15.12.2020 21:20
Konu
Mathematics, 15.12.2020 21:20
Konu
Mathematics, 15.12.2020 21:20