subject
Mathematics, 10.12.2021 01:50 kassandrarosario1115

Company A makes 20 notebooks in 4 hours. Company B make 28 notebooks in 3 hours. Write a statement comparing the number of notebooks made per
hour.

ansver
Answers: 3

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 13:50, miacervenka
At a sand and gravel plant, sand is falling off a conveyor and onto a conical pile at a rate of 16 cubic feet per minute. the diameter of the base of the cone is approximately three times the altitude. at what rate is the height of the pile changing when the pile is 12 feet high? (hint: the formula for the volume of a cone is v = 1 3 πr2h.)
Answers: 3
image
Mathematics, 21.06.2019 21:00, villanuevajose95
A. s.a.! this is a similarity in right triangles. next (solve for x)a.) 12b.) 5c.) 12.5d.) [tex] 6\sqrt{3} [/tex]
Answers: 2
image
Mathematics, 21.06.2019 22:30, juli8350
Which set of lengths could represent the sides of a triangle? a. 3, 7, 10 b. 4, 5, 10 c. 6, 8, 14 d. 12, 6, 7
Answers: 1
image
Mathematics, 21.06.2019 23:00, davisbrittany5784
Apoll is being conducted at a mall nothingto obtain a sample of the population of an entire country. what is the frame for this type of​ sampling? who would be excluded from the survey and how might this affect the results of the​ survey? what is the frame for this type of​ sampling? a. the frame is people who need new clothes. b. the frame is people who shop at the mall. c. the frame is people who like to shop. d. the frame is the entire population of the country. who would be excluded from the survey and how might this affect the results of the​ survey? a. any person that does not need new clothes is excluded. this could result in sampling bias due to undercoverage. b. any person who does not shop at the mall is excluded. this could result in sampling bias due to undercoverage. c. any person who does not shop at the mall is excluded. this could result in nonresponse bias due to people not participating in the poll. d. there is nobody that is being excluded from the survey.
Answers: 3
You know the right answer?
Company A makes 20 notebooks in 4 hours. Company B make 28 notebooks in 3 hours. Write a statement...

Questions in other subjects:

Konu
Arts, 19.07.2019 14:30
Konu
English, 19.07.2019 14:30