subject
Mathematics, 09.12.2021 02:20 silas99

1. Think of a system of nonlinear inequalities The number of products produced by the first company did not exceed 950 per day, and the capacity of the second company was equal to 95% of the first plant. With the introduction of new equipment by the second company, the capacity was increased by 23% of the first plant. It now produces more than 1,000 products a day. How many products did each factory produce before the new equipment was introduced? (Product number is integer)

ansver
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 13:20, erickamiles1797
In the triangle abc< angle c is a right angle. find the value of the trig function indicated. find tan a if a =12, b=5 a. 13/12 b. 12/13 c. 5/12 d.12/5
Answers: 2
image
Mathematics, 21.06.2019 17:50, amcdonald009
To solve the system of equations below, grace isolated the variable y in the first equation and then substituted into the second equation. what was the resulting equation? 3y=12x x^2/4+y^2/9=1
Answers: 1
image
Mathematics, 21.06.2019 18:50, cmaya
Standard deviation of 19,29,21,22,23
Answers: 1
image
Mathematics, 21.06.2019 19:20, ayeofaygo5168
The fraction of defective integrated circuits produced in a photolithography process is being studied. a random sample of 300 circuits is tested, revealing 17 defectives. (a) calculate a 95% two-sided confidence interval on the fraction of defective circuits produced by this particular tool. round the answers to 4 decimal places. less-than-or-equal-to p less-than-or-equal-to (b) calculate a 95% upper confidence bound on the fraction of defective circuits. round the answer to 4 decimal places. p less-than-or-equal-to
Answers: 3
You know the right answer?
1. Think of a system of nonlinear inequalities The number of products produced by the first company...

Questions in other subjects:

Konu
Spanish, 21.11.2019 07:31