subject
Mathematics, 08.12.2021 18:40 nculberson6

If a building contractor hires 7 day laborers and 2 concrete finishers, his payroll for the day is $1598. If he hires 1 day laborer and 5 concrete finishers, his daily cost is $1124. Find the daily wage for each type of worker. Solve the problem using matrices.

ansver
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 23:30, heybro12
The perimeter of an equilateral triangle is 4 cm more than the perimeter of a square and the length of a side of the triangle is 8 cm more than the length of a side of the aware. find the length of a side of the equilateral triangle
Answers: 1
image
Mathematics, 22.06.2019 03:00, ani61
Let d be the domain and let ƒ be the possible function. determine if the relation is an example of a function. d = {x| x is a date, expressed in day/month/year} ƒ(x) = temperature in seattle washington on that date
Answers: 3
image
Mathematics, 22.06.2019 04:00, mutoni55
The label on a can of lemonade gives the volume as 12 fl 0z or 355ml verify that these two measurements are nearly equivalent
Answers: 1
image
Mathematics, 22.06.2019 04:30, Baby010391
Dimitri used a coupon that saved him 80 percent, or $6.87. he paid $34.35 for the items. dimitri used a coupon that saved him 80 percent, or $27.48. he paid $34.35 for the items. dimitri used a coupon that saved him 80 percent, or $6.87. the price of the items before the discount was $34.35.dimitri used a coupon that saved him 80 percent, or $27.48. the price of the items before the discount was $34.35.
Answers: 1
You know the right answer?
If a building contractor hires 7 day laborers and 2 concrete finishers, his payroll for the day is $...

Questions in other subjects:

Konu
Business, 29.05.2021 06:20