If 40 men build 4 buildings in 12 months how many men would be required to build 6 buildings in 4 months.

ansver
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 17:30, sarahhfaithhh
One line passes through (-7,-4) and (5,4) . another line passes through the point (-4,6) and (6,-9)
Answers: 1
image
Mathematics, 21.06.2019 17:30, liaholmes8
If i have one apple and give you the apple, how many apples do i have?
Answers: 2
image
Mathematics, 21.06.2019 20:30, nosugh
If m∠abc = 70°, what is m∠abd? justify your reasoning.  using the addition property of equality, 40 + 70 = 110, so m∠abd = 110°.  using the subtraction property of equality, 70 − 30 = 40, so m∠abd = 30°.  using the angle addition postulate, 40 + m∠abd = 70. so, m∠abd = 30° using the subtraction property of equality.  using the angle addition postulate, 40 + 70 = m∠abd. so, m∠abd = 110° using the addition property of equality.
Answers: 2
image
Mathematics, 21.06.2019 22:00, prishnasharma34
The two box p digram the two box plots show the data of the pitches thrown by two pitchers throughout the season. which statement is correct? check all that apply. pitcher 1 has a symmetric data set. pitcher 1 does not have a symmetric data set. pitcher 2 has a symmetric data set. pitcher 2 does not have a symmetric data set. pitcher 2 has the greater variation. ots represent the total number of touchdowns two quarterbacks threw in 10 seasons of play
Answers: 1
You know the right answer?
If 40 men build 4 buildings in 12 months how many men would be required to build 6 buildings in 4 mo...

Questions in other subjects:

Konu
Mathematics, 04.02.2020 17:54
Konu
History, 04.02.2020 17:54